2000 +

Implemented projects

3500 +

Conferences attended

4000 +

Satisfied customers

About Service

Why Roofing Estimating Requires Specialists

Roofing is one of the most measurement-intensive trades in construction. Unlike interior trades where you measure flat floor areas, roofing requires calculating sloped areas using pitch multipliers, accounting for hips, valleys, ridges, rakes, eaves, dormers, and penetrations — each affecting material quantities differently. A 10/12 pitch roof requires 30% more material than a flat roof of the same footprint, and missing a single valley run can throw off flashing and underlayment quantities by hundreds of linear feet. Generic estimators often use simplified "square footage times cost per square" calculations that ignore these variables. Our roofing estimators measure roof planes individually from architectural drawings using Planswift and Bluebeam, apply correct pitch factors, calculate waste percentages by material type (shingles waste differently than TPO membrane), and count every boot, pipe jack, and curb flashing. This level of detail is why roofing contractors trust Phoenix Estimations over general-purpose estimating services. Related reading: How to Estimate Thermal Insulation Costs and Construction Estimating Checklist for Bidding.

Get Your Roofing Estimate

Roofing Systems

Roofing Systems We Estimate

Roofing estimating services for commercial and residential projects

Every Roofing System, Accurately Estimated

We estimate steep-slope systems (asphalt shingles, wood shakes, slate, clay tile, concrete tile, metal panels, standing seam) and low-slope systems (TPO, EPDM, PVC, built-up roofing, modified bitumen, spray foam, fluid-applied). Each system has unique waste factors, overlap requirements, and accessory needs that our estimators account for. We also cover green roofs, cool roofs, and photovoltaic-ready roof systems. Every estimate includes the complete roofing assembly — deck preparation, vapor retarders, insulation, membrane or shingle installation, flashings, and edge details.

Steep-Slope & Low-Slope Roofing Estimates

Steep-Slope Roofing (Residential & Architectural)

Steep-slope roofing requires pitch-adjusted area calculations, starter strip and ridge cap quantities, valley metal lengths, step and counter flashing at walls, drip edge measurements, and ice and water shield in eave and valley areas. Our estimators calculate each roof plane separately using the actual roof pitch from architectural sections, then apply material-specific waste factors (typically 10-15% for shingles, 5-8% for metal panels).

Systems: Asphalt Shingles, Wood Shakes, Slate, Clay Tile, Concrete Tile, Standing Seam Metal, Metal Panels

Low-Slope Roofing (Commercial & Industrial)

Low-slope roofing involves membrane square footage with seam overlap calculations, insulation board counts by R-value and thickness, vapor retarder area, cover board quantities, adhesive and fastener calculations, edge metal and coping cap lengths, roof drain counts, pitch pocket quantities, and expansion joint treatments. We calculate tapered insulation cricket layouts for proper drainage and include all penetration flashings for curbs, pipes, and equipment supports.

Systems: TPO, EPDM, PVC, BUR, Modified Bitumen, SPF, Fluid-Applied, Green Roof

Roofing Components We Measure

Every roofing estimate from Phoenix Estimations includes precise quantities for each of these components, measured directly from your architectural roof plan and building sections.

Roof Area (Squares)

Underlayment / Felt

Ice & Water Shield

Ridge & Hip Cap

Valley Flashing

Step & Counter Flashing

Drip Edge / Edge Metal

Starter Strip

Roof Insulation Boards

Coping Cap / Parapet

Pipe Boots & Jacks

Roof Drains & Scuppers

Gutters & Downspouts

Fasteners & Adhesives

Ventilation (Ridge/Soffit)

Curb Flashings

How We Estimate Roofing Projects

Our roofing estimating process is different from a general construction takeoff. Roofing demands trade-specific measurement techniques that account for slope, geometry, and material-specific waste. Here's how our team approaches every roofing project:

1

Roof Plan Analysis

Review architectural roof plan, building sections, and roof details to identify all roof planes, pitch angles, and penetration locations.

2

Digital Area Measurement

Measure each roof plane separately in Planswift, then apply the correct pitch multiplier from building sections to get true sloped area.

3

Linear Measurements

Measure ridges, hips, valleys, rakes, eaves, wall-to-roof transitions, and edge conditions. These drive flashing, edge metal, and accessory quantities.

4

Penetration Count

Count every pipe boot, vent jack, curb, skylight, equipment support, and roof hatch. Each requires specific flashing details.

5

Waste & Overlap Factors

Apply material-specific waste (10-15% shingles, 5-8% metal, 3-5% membrane) and seam overlap requirements for membrane systems.

6

Pricing & Delivery

Apply RSMeans zip-code based pricing for material and labor. Senior estimator review. Deliver Excel spreadsheet with color-coded roof plan markups.

For more on estimating methodology, read our guide to estimating construction costs and construction cost estimating guide.

Roofing Clients We Serve

Our roofing estimating services are used by every type of roofing professional — from single-crew residential roofers to multi-state commercial roofing operations.

Residential Roofing Contractors

Re-roofs, new construction, storm damage repairs, and insurance restoration. We calculate shingle bundles, felt rolls, ice and water shield, flashing, and starter strip — ready for your supplier order.

Commercial Roofing Contractors

TPO, EPDM, PVC, BUR, and modified bitumen systems for flat and low-slope commercial roofs. We include insulation board counts, tapered insulation layouts, and membrane seam calculations.

General Contractors & Developers

Full Division 7 roofing scope estimates for budget planning and subcontractor bid verification. We help GCs confirm roofing sub pricing before contract award.

Why Roofing Contractors Choose Phoenix Estimations

Pitch-Adjusted Measurements

We don't just measure flat plan area. Every roof plane is adjusted for actual pitch using architectural sections, giving you true material quantities.

Material-Specific Waste Factors

Shingles, metal, and membrane each waste differently. We apply the correct waste percentage for your specific roofing material — not a generic 10%.

24-48 Hour Residential

Residential roofing estimates delivered within 24-48 hours. Commercial flat roof projects typically 2-4 business days based on complexity.

Supplier-Ready Material Lists

Our roofing estimates are formatted so you can hand them directly to your roofing supply house for material ordering — no reformatting needed.

55-65% Cost Savings

An in-house roofing estimator costs $60K-$80K/year. Our monthly package covers 10-15 roofing projects for $2,000 — saving you 55-65%.

Marked-Up Roof Plans

Every roofing estimate includes color-coded roof plan markups showing measured areas, linear measurements, and penetration locations for verification.

Outsource Your Roofing Estimating to Phoenix Estimations

Roofing contractors face a unique estimating challenge: bid volume is seasonal and unpredictable. During storm season or spring, you might need to price 20+ roofs per week. During winter, volume drops to a handful. Maintaining a full-time roofing estimator at $60,000-$80,000/year means paying the same overhead regardless of bid volume.

Outsourcing your roofing estimating to Phoenix Estimations lets you scale up and down with demand. Our per-project pricing starts at $150 per roof, and our monthly packages handle 10-15 projects at a fixed $2,000/month. During peak season, you can add projects as needed. During slow months, you pay nothing. This flexibility is why roofing contractors prefer outsourcing over in-house. For more on outsourcing benefits, read our guide on value engineering in construction.

Scale With Demand

Bid more during peak season, scale down in winter. No fixed overhead.

Get Started
Construction Photos

"Before Phoenix Estimations, we were guessing on shingle quantities and losing money on every third job. Now our material orders match the job site within 2-3%. That accuracy pays for the estimating service many times over."

Construction Photos

"We run a 12-crew commercial roofing operation and bid on 30+ jobs per month. Phoenix handles every single estimate. Their TPO and EPDM takeoffs are the most detailed we've seen in 20 years."

Construction Photos

"Storm season used to overwhelm our office — 40 estimates needed in a week. Phoenix scaled up instantly and delivered every one on time. That flexibility is worth more than any full-time hire."

Case Study: Commercial Roofing Contractor

The Problem

A commercial roofing contractor in Ohio was losing money on TPO membrane jobs because their flat-roof takeoffs consistently underestimated edge metal, coping cap, and curb flashing quantities by 15-20%. They were also missing tapered insulation crickets on complex roof geometries, leading to $8,000-$12,000 in change orders per project. With 15 bids per month and a 19% win rate, they needed both accuracy and volume improvements.

The Solution

Phoenix Estimations provided complete commercial roofing takeoffs including membrane area with seam calculations, insulation board counts with tapered cricket layouts, all edge metal and coping lengths, curb and pipe flashings, roof drain details, and fastener calculations. Each estimate was delivered in 2-3 business days with marked-up roof plans showing every measurement area and linear dimension. We used Planswift for measurements and RSMeans for Ohio-specific pricing.

The Outcomes

Edge metal and flashing quantity accuracy improved to within 3%, eliminating mid-project change orders entirely. The contractor saved over $96,000 annually in eliminated overruns. With faster estimates, they increased bid volume from 15 to 28 projects per month. Win rate jumped from 19% to 38% because accurate quantities produced tighter, more competitive pricing. Annual revenue grew by 52% in the first year.

Ready to achieve similar results?

Get Your Roofing Estimate

Frequently Asked Questions About Roofing Estimating

Single-trade roofing estimates start at $150 for residential projects. Our monthly packages cover 10-15 roofing projects at $2,000/month. Upload your plans for an exact quote within 5 minutes.
We estimate all roofing systems including asphalt shingles, TPO single-ply, EPDM rubber, PVC membrane, standing seam metal, built-up roofing (BUR), modified bitumen, slate, clay and concrete tiles, wood shakes, green roofs, and spray polyurethane foam (SPF) systems.
Residential roofing estimates are delivered within 24-48 hours. Commercial roofing projects typically take 2-4 business days depending on roof complexity, number of roof levels, and scope of accessories.
Every roofing estimate includes roof area measurements (squares), material quantities by type, underlayment calculations, flashing lengths, ridge and hip measurements, valley lengths, penetration counts, accessory quantities, labor hours, material costs, and equipment pricing using RSMeans zip-code rates. Delivered in Excel with color-coded marked-up roof plans.
Yes. Phoenix Estimations provides roofing estimates for residential re-roofs, new residential construction, commercial flat roofing, industrial metal roofing, institutional projects, and multi-family developments across the USA and Canada.
We calculate roof areas from architectural drawings and blueprints using Planswift and Bluebeam digital takeoff tools. For projects without detailed roof plans, we can work with site photos and satellite measurements, but blueprint-based takeoffs deliver the highest accuracy.
An in-house roofing estimator costs $60,000-$80,000 per year in salary plus software, training, and benefits. Phoenix Estimations provides the same quality at $150 per project or $2,000/month for 10-15 projects — saving roofing contractors 55-65% on estimating expenses while increasing bid volume.

Related Resources

How to Estimate Thermal Insulation Costs

Blog article covering insulation estimation methods including roof insulation.

Construction Estimating Checklist for Bidding

Complete checklist for contractors preparing bids on roofing and other trades.

Thermal & Moisture Protection Estimating

Full Division 7 scope including roofing, waterproofing, insulation, and siding.

Subscribe to our Newsletter!

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.